• Language:
  •  
  •  
  •  
+49 (30) 93663981
Mon-Fri: 8:30am - 6:00pm
... best spare parts for automation and industry
Searching...
Nothing found.
[[ item.description.prodDescription ]]
* Search is limited to the first 500 results. Please refine your criteria if necessary.
9LA1110-8AD10-1AA1

9LA1110-8AD10-1AA1

Manufacturer: SIEMENS

Price: On Request

SIMATIC System Audit SCADA allows a detailed insight into a WinCC-based SCADA system with lower-level SIMATIC S7 automation. Checking and evaluation of electronically queryable compo- nents of a system configuration, under consideration of test focal points adapted to the used engineering tools. The result is a system audit status report with concrete indication of weak points and their elimination. Objective: Analysis of the system with Possibly complete identification of potential risks.


Similar items in same category:
9LA1110-8AC10-4AA2 9LA1110-8AC10-4AA2 System Audit DCS Upgrade Study is a special module to prepare for a PCS 7 upgrade project. As with the system audit DCS status, among other things, the general service capability of the PCS 7 system is analyzed and evaluated. Focus: - General PCS 7 system stat. - Possibly exact consideration of the upgrade / update capability Result: System Upgrade Report Validity: PCS 7 V6.1 or higher Objectives: + Possibly complete identification of potential risks + Detailed preparation for possible efficient implementation of PCS 7 System Upgrades.
9LA1110-8AC10-4AA3 9LA1110-8AC10-4AA3 System DCS LCS basically encompasses the same verification contents as the "Audit DCS status" module in addition, a "conformance check" regarding the subject terms of the LCS contents is carried out. Result: Lifecycle Conformance Report Objectives: + Possibly complete identification of potential risks + Preparation of a long-term PCS 7 Lifecycle Service agreement with a duration of up to 15 years.
9LA1110-8AC10-8AA1 9LA1110-8AC10-8AA1 Travel costs (individual) Project-specific costs for means of transport (rental vehicle, aircraft), accommodation, daily allowance, etc. Price on request
9LA1110-8AD10-0AA1 9LA1110-8AD10-0AA1 SIMATIC system assessment SCADA Selective analysis of a WinCC System with subordinate SIMATIC S7 automation level charged at a flat price. In coordination with the customer a selection of system components is checked and evaluated according to defined test focal points. When performing the assessment no further on-site calls are required except for the data acquisition Result: Audit status report (selective) / Objectives: Entry-level service for the representation of an audit scope and preparation of a short-term service agreement
9LA1110-8AE10-1AA0 9LA1110-8AE10-1AA0 Asset Optimization Services Analysis (max. 100 MLFB) on the basis of the provided customer data an analysis and a comparison of the system and stock inventory is performed. The availabilities as well as the product life cycle with discontinuations and delivery periods of the respective products are taken into consideration. The result of the analysis is a standardized, product-oriented report, which is of great importance for the optimization and maintenance of the warehouse stock.
9LA1110-8AE10-2AA0 9LA1110-8AE10-2AA0 Asset Optimization Services Concept (max. 3 days) On the basis of the results of the analysis phase, in cooperation with the customer, a concrete optimization concept is created. A risk evaluation of the components can be carried out together with the customer. With this concept optimized target stock levels can be determined. Identification of excess inventory and missing spare parts. Recommendations for the further procedure are given.
9LA1110-8AE10-3AA0 9LA1110-8AE10-3AA0 Asset Optimization Services Implementation (for operation) On the basis of the results from the concept phase 9LA1110-8AE10-2AA0 and an individual offer optimization measures are implemented within a defined period. Objective: Creation of the basis for the Asset Optimization Services Operation
9LA1110-8AE10-4AA0 9LA1110-8AE10-4AA0 Asset Optimization Services Operation spare parts supply Provision of a defined spare parts package based on an individual customer offer. The spare parts are the property of Siemens. The scope of services is the provision of components with defined delivery time and place of delivery for an agreed period. Implementation of cyclic and standardized inventory analyses to consider the product lifecycle.