• Language:
  •  
  •  
  •  
+49 (30) 93663981
Mon-Fri: 8:30am - 6:00pm
... best spare parts for automation and industry
Searching...
Nothing found.
[[ item.description.prodDescription ]]
* Search is limited to the first 500 results. Please refine your criteria if necessary.
9LA1110-8AC10-4AA2

9LA1110-8AC10-4AA2

Manufacturer: SIEMENS

Price: On Request

System Audit DCS Upgrade Study is a special module to prepare for a PCS 7 upgrade project. As with the system audit DCS status, among other things, the general service capability of the PCS 7 system is analyzed and evaluated. Focus: - General PCS 7 system stat. - Possibly exact consideration of the upgrade / update capability Result: System Upgrade Report Validity: PCS 7 V6.1 or higher Objectives: + Possibly complete identification of potential risks + Detailed preparation for possible efficient implementation of PCS 7 System Upgrades.


Similar items in same category:
9LA1110-8AC10-2DA2 9LA1110-8AC10-2DA2 SIMATIC PCS 7 System Audit LCS AS5 SAP Option package for analysis / evaluation of 5 automation stations (AS) with standard application (no fail-safe application) within the framework of one "SIMATIC PCS 7 Audit LCS" Note: Module can only be ordered in connection with "SIMATIC PCS 7 System- Audit LCS Basis" !
9LA1110-8AC10-2DA3 9LA1110-8AC10-2DA3 SIMATIC PCS 7 System Audit LCS AS10 SAP Option package for analysis / evaluation of 10 automation stations (AS) with standard application (no fail-safe application) within the framework of one "SIMATIC PCS 7 Audit LCS" Note: Module can only be ordered in connection with "SIMATIC PCS 7 System- Audit LCS Basis" !
9LA1110-8AC10-3AA1 9LA1110-8AC10-3AA1 Extended analyses Special configurations Option package for analysis and evaluation of PCS 7 system configurations with extended scope For example Batch, Route Control Domain control, F-system, etc. or for more detailed analyses of topics that attracted attention during the implementation of an audit / assessment and that must be analyzed customer. Price on request
9LA1110-8AC10-4AA1 9LA1110-8AC10-4AA1 System Audit DCS Status Detailed PCS 7 system analysis as the basis for: + Decision regarding system expansion + Development of service strategy + Increase of general system availability The complete PCS 7 system is subjected to an analysis. (PCS 7 project/diagnostics data) Focus: + Service capability of PCS 7 system + Current system status Result: Audit status report Objectives: + Possibly complete identification of potential risks. + Definition of suitable measures to generally increase the PCS 7 system availability
9LA1110-8AC10-4AA3 9LA1110-8AC10-4AA3 System DCS LCS basically encompasses the same verification contents as the "Audit DCS status" module in addition, a "conformance check" regarding the subject terms of the LCS contents is carried out. Result: Lifecycle Conformance Report Objectives: + Possibly complete identification of potential risks + Preparation of a long-term PCS 7 Lifecycle Service agreement with a duration of up to 15 years.
9LA1110-8AC10-8AA1 9LA1110-8AC10-8AA1 Travel costs (individual) Project-specific costs for means of transport (rental vehicle, aircraft), accommodation, daily allowance, etc. Price on request
9LA1110-8AD10-0AA1 9LA1110-8AD10-0AA1 SIMATIC system assessment SCADA Selective analysis of a WinCC System with subordinate SIMATIC S7 automation level charged at a flat price. In coordination with the customer a selection of system components is checked and evaluated according to defined test focal points. When performing the assessment no further on-site calls are required except for the data acquisition Result: Audit status report (selective) / Objectives: Entry-level service for the representation of an audit scope and preparation of a short-term service agreement
9LA1110-8AD10-1AA1 9LA1110-8AD10-1AA1 SIMATIC System Audit SCADA allows a detailed insight into a WinCC-based SCADA system with lower-level SIMATIC S7 automation. Checking and evaluation of electronically queryable compo- nents of a system configuration, under consideration of test focal points adapted to the used engineering tools. The result is a system audit status report with concrete indication of weak points and their elimination. Objective: Analysis of the system with Possibly complete identification of potential risks.