System DCS LCS basically encompasses the same verification contents as the "Audit DCS status" module in addition, a "conformance check" regarding the subject terms of the LCS contents is carried out. Result: Lifecycle Conformance Report Objectives: + Possibly complete identification of potential risks + Preparation of a long-term PCS 7 Lifecycle Service agreement with a duration of up to 15 years.
Similar items in same category:
9LA1110-8AC10-2DA3 | SIMATIC PCS 7 System Audit LCS AS10 SAP Option package for analysis / evaluation of 10 automation stations (AS) with standard application (no fail-safe application) within the framework of one "SIMATIC PCS 7 Audit LCS" Note: Module can only be ordered in connection with "SIMATIC PCS 7 System- Audit LCS Basis" ! | |
9LA1110-8AC10-3AA1 | Extended analyses Special configurations Option package for analysis and evaluation of PCS 7 system configurations with extended scope For example Batch, Route Control Domain control, F-system, etc. or for more detailed analyses of topics that attracted attention during the implementation of an audit / assessment and that must be analyzed customer. Price on request | |
9LA1110-8AC10-4AA1 | System Audit DCS Status Detailed PCS 7 system analysis as the basis for: + Decision regarding system expansion + Development of service strategy + Increase of general system availability The complete PCS 7 system is subjected to an analysis. (PCS 7 project/diagnostics data) Focus: + Service capability of PCS 7 system + Current system status Result: Audit status report Objectives: + Possibly complete identification of potential risks. + Definition of suitable measures to generally increase the PCS 7 system availability | |
9LA1110-8AC10-4AA2 | System Audit DCS Upgrade Study is a special module to prepare for a PCS 7 upgrade project. As with the system audit DCS status, among other things, the general service capability of the PCS 7 system is analyzed and evaluated. Focus: - General PCS 7 system stat. - Possibly exact consideration of the upgrade / update capability Result: System Upgrade Report Validity: PCS 7 V6.1 or higher Objectives: + Possibly complete identification of potential risks + Detailed preparation for possible efficient implementation of PCS 7 System Upgrades. | |
9LA1110-8AC10-8AA1 | Travel costs (individual) Project-specific costs for means of transport (rental vehicle, aircraft), accommodation, daily allowance, etc. Price on request | |
9LA1110-8AD10-0AA1 | SIMATIC system assessment SCADA Selective analysis of a WinCC System with subordinate SIMATIC S7 automation level charged at a flat price. In coordination with the customer a selection of system components is checked and evaluated according to defined test focal points. When performing the assessment no further on-site calls are required except for the data acquisition Result: Audit status report (selective) / Objectives: Entry-level service for the representation of an audit scope and preparation of a short-term service agreement | |
9LA1110-8AD10-1AA1 | SIMATIC System Audit SCADA allows a detailed insight into a WinCC-based SCADA system with lower-level SIMATIC S7 automation. Checking and evaluation of electronically queryable compo- nents of a system configuration, under consideration of test focal points adapted to the used engineering tools. The result is a system audit status report with concrete indication of weak points and their elimination. Objective: Analysis of the system with Possibly complete identification of potential risks. | |
9LA1110-8AE10-1AA0 | Asset Optimization Services Analysis (max. 100 MLFB) on the basis of the provided customer data an analysis and a comparison of the system and stock inventory is performed. The availabilities as well as the product life cycle with discontinuations and delivery periods of the respective products are taken into consideration. The result of the analysis is a standardized, product-oriented report, which is of great importance for the optimization and maintenance of the warehouse stock. |