• Language:
  •  
  •  
  •  
+49 (30) 93663981
Mon-Fri: 8:30am - 6:00pm
... best spare parts for automation and industry
Searching...
Nothing found.
[[ item.description.prodDescription ]]
* Search is limited to the first 500 results. Please refine your criteria if necessary.
9LA1528-8AC10-3AA1

9LA1528-8AC10-3AA1

Manufacturer: SIEMENS

Price: On Request

Extended analyses Special configurations Option package for analysis and evaluation of PCS 7 system configurations with extended scope For example Batch, Route Control Domain control, F-system, etc. or for more detailed analyses of topics that attracted attention during the implementation of an audit / assessment and that must be analyzed customer. Price on request


Similar items in same category:
9LA1528-1CD00 9LA1528-1CD00 SIMATIC Remote Services Preventive support module (1 report for 10 devices) Summary and traffic-light report Analysis of the system-relevant SIMATIC diagnostic data. Evaluation by an expert with corresponding recommended actions to improve the availability of the products Support during implementation of the preventive measures. Results in the form of a System Status Report Verification carried out once
9LA1528-1CE00 9LA1528-1CE00 SIMATIC Remote Services Preventive support module (up to 75 devices) Summary and traffic-light report Analysis of the system-relevant SIMATIC diagnostic data. Evaluation by an expert with corresponding recommended actions to improve the availability of the products Support during implementation of the preventive measures. Results in the form of a System Status Report are provided once every quarter year (4 reports per year)
9LA1528-1CF00 9LA1528-1CF00 SIMATIC Remote Services Preventive support module (up to 100 devices) Summary and traffic-light report Analysis of the system-relevant SIMATIC diagnostic data. Evaluation by an expert with corresponding recommended actions to improve the availability of the products Support during implementation of the preventive measures. Results in the form of a System Status Report are provided once every quarter year (4 reports per year)
9LA1528-8AC10-0AA1 9LA1528-8AC10-0AA1 SIMATIC System Assessment DCS select. analysis of a PCS 7 syst. In coordination with the customer a selection of system components is checked and corresp. defined focal points evaluated. Except for the data acquisition no further on-site presence is required for an assessment. Result: Audit status report (reduced number of components) Objectives: + Introductory service for exempl. representation of audit scope, report contents and measures suggestions./ + Preparation of a short-term service agreement. (can only be ordered for system audit DCS status)
9LA1528-8AC10-4AA1 9LA1528-8AC10-4AA1 System Audit DCS Status Detailed PCS 7 system analysis as the basis for: + Decision regarding system expansion + Development of service strategy + Increase of general system availability The complete PCS 7 system is subjected to an analysis. (PCS 7 project/diagnostics data) Focus: + Service capability of PCS 7 system + Current system status Result: Audit status report Objectives: + Possibly complete identification of potential risks. + Definition of suitable measures to generally increase the PCS 7 system availability
9LA1528-8AC10-4AA2 9LA1528-8AC10-4AA2 System Audit DCS Upgrade Study is a special module to prepare for a PCS 7 upgrade project. As with the system audit DCS status, among other things, the general service capability of the PCS 7 system is analyzed and evaluated. Focus: - General PCS 7 system stat. - Possibly exact consideration of the upgrade / update capability Result: System Upgrade Report Validity: PCS 7 V6.1 or higher Objectives: + Possibly complete identification of potential risks + Detailed preparation for possible efficient implementation of PCS 7 System Upgrades.
9LA1528-8AC10-4AA3 9LA1528-8AC10-4AA3 System DCS LCS basically encompasses the same verification contents as the "Audit DCS status" module in addition, a "conformance check" regarding the subject terms of the LCS contents is carried out. Result: Lifecycle Conformance Report Objectives: + Possibly complete identification of potential risks + Preparation of a long-term PCS 7 Lifecycle Service agreement with a duration of up to 15 years.
9LA1528-8AD10-0AA1 9LA1528-8AD10-0AA1 SIMATIC system assessment SCADA Selective analysis of a WinCC System with subordinate SIMATIC S7 automation level charged at a flat price. In coordination with the customer a selection of system components is checked and evaluated according to defined test focal points. When performing the assessment no further on-site calls are required except for the data acquisition Result: Audit status report (selective) / Objectives: Entry-level service for the representation of an audit scope and preparation of a short-term service agreement