• Language:
  •  
  •  
  •  
+49 (30) 93663981
Mon-Fri: 8:30am - 6:00pm
... best spare parts for automation and industry
Searching...
Nothing found.
[[ item.description.prodDescription ]]
* Search is limited to the first 500 results. Please refine your criteria if necessary.
9LA1276-8AC10-4AA3

9LA1276-8AC10-4AA3

Manufacturer: SIEMENS

Price: On Request

System DCS LCS Basically comprises the same checks as the "Audit DCS status" module In addition, a conformance check" regarding the subject terms of the LCS contract is performed. Result: Lifecycle conformance report Goals: + Most complete identifi- cation possible of potential risks + Preparation of a long- term PCS 7 lifecycle service contract with a duration of up to 15 years.


Similar items in same category:
9LA1276-6SV01-0AA0 9LA1276-6SV01-0AA0 SIVaaS service training; Content: Basics of virtualization, scope of services SIVaaS system, operation and diagnosis of SIVaaS systems. Price for one workshop (1 day for max. 10 participants) Travel expenses and other expenses excluded
9LA1276-8AC10-0AA1 9LA1276-8AC10-0AA1 SIMATIC System Assessment DCS Select. analysis of a PCS 7 syst. In coordination with the customer, a selection of system components is tested and, according to def. focal points, evaluated. For an assessment, except for data acquisition, no further on-site call is required. Result: Audit status report (reduc. number of components) Goals: + Introductory service for exempl. representation of audit scope, report contents and measures suggestions./ + Preparation of a short-term service agreement. (can only be ordered for f. system audit DCS status)
9LA1276-8AC10-4AA1 9LA1276-8AC10-4AA1 System audit DCS status Detailed PCS 7 system analysis As basis for: + Decision regarding system expansion + Development of service strategy + Increase of general system availability The complete PCS 7 system is analyzed. (PCS 7 project/diagnostics data) Focus: + Service capability of the PCS 7 system + Current system status Result: Audit status report Goals: + Most complete identifi- cation possible of potential risks. + Definition of suitable measures to generally increase the PCS 7 system availability
9LA1276-8AC10-4AA2 9LA1276-8AC10-4AA2 System audit DCS upgrade study is a spec. module for preparing a PCS 7 upgrade project. As with the system audit DCS status, among For example, the general service capability of the PCS 7 system is analyzed and evaluated. Focus: - General PCS 7 system stat. - Most accurate consideration possible of the upgrade/update capability Result: System status report Validity: PCS 7 V6.1 or higher Goals: + Most complete identifi- cation possible of potential risks + Detailed preparation of most efficient implementation of PCS 7 system upgrades.
9LA1276-8AG10-1AA0 9LA1276-8AG10-1AA0 Lifecycle Information Services basic, based on the provided customer data, an analysis of the equipment is carried out. The result of the analysis is a report comprising: . availability forecast technical evaluation of the results plant size small, up to 50 different products one-time report the supplementary conditions for service provisions apply
9LA1276-8AG10-1AB0 9LA1276-8AG10-1AB0 Lifecycle Information Services basic, based on the provided customer data, an analysis of the equipment is carried out. The result of the analysis is a report comprising: . availability forecast technical evaluation of the results plant size small, up to 50 different products cyclic report, 1 time per year (the contract is extended automatically by one year if not terminated 3 months prior to expiration) the supplementary conditions for service provisions apply
9LA1276-8AG10-1AC0 9LA1276-8AG10-1AC0 Lifecycle Information Services basic, based on the provided customer data, an analysis of the equipment is carried out. The result of the analysis is a report comprising: . availability forecast technical evaluation of the results plant size small, up to 50 different products cyclic report, 2 times per year (the contract is extended automatically by one year if not terminated 3 months prior to expiration) the supplementary conditions for service provisions apply
9LA1276-8AG10-1AD0 9LA1276-8AG10-1AD0 Lifecycle Information Services basic, based on the provided customer data, an analysis of the equipment is carried out. The result of the analysis is a report comprising: . availability forecast technical evaluation of the results plant size small, up to 50 different products cyclic report, 4 times per year (the contract is extended automatically by one year if not terminated 3 months prior to expiration) the supplementary conditions for service provisions apply