Searching...
Nothing found.
[[ item.description.prodDescription ]]
This Product is on your Inquiry List.
6FC8530-0TT02-0EA0
Manufacturer: SIEMENS
Price: On Request
Introduction to the MMT applications on machines and the server, troubleshooting. Incl. instruction. Precondition: Training is mandatory for each new installation of MMT. Maximum of 10 participants. Price does not include the costs for travel and travel time .
Similar items in same category:
6FC8530-0MM02-0EA0 | Database Services supports end users that use SINUMERIK Integrated (SI) products for optimization of their production. The provision of the Database Services is performed by a Siemens Consultant and is applied for the backup, maintenance and updating of the SI database. Six dates within a service period of 3 years are agreed with the customer. Within the scope of the service, a selective data backup of the SI system is created. The service is supplemented by memory optimization and a log file analysis. | |
6FC8530-0SS00-0EA0 | Installation and configuration of the basic software (without application) of a server. Coordination and project management for the customer. Precondition: If acc. to Digitalization Check the standard functionality(AMP, MMP,MMT,AMC) is sufficient and this is a new installation, the service must be ordered for each machine - regardless of how many SW modules are ordered. At the time of installation the SW license must be available. Price does not include the costs for travel and travel time . | |
6FC8530-0TT00-0EA0 | Introduction to the AMP applications on machines and the server, troubleshooting. Incl. instruction. Precondition: Training is mandatory for each new installation of AMP. Maximum of 10 participants. Price does not include the costs for travel and travel time . | |
6FC8530-0TT01-0EA0 | Introduction to the MMP applications on machines and the server, troubleshooting. Incl. instruction. Precondition: Training is mandatory for each new installation of MMP. Maximum of 10 participants. Price does not include the costs for travel and travel time . | |
6FC8530-0TT03-0EA0 | After a test(operation)phase the parameter assignment of the control monitors is further optimized in a workshop, automatic tests are set up. Precondition: This service is mandatory for each new AMC installation. Maximum of 10 participants. Price does not include the costs for travel and travel time . | |
6FC8530-0TT04-0EA0 | The administration of the basic system is optimized using the ongoing analysis of warning/ error messages from the applications and the database . Administration and backup of the database. Precondition: This service is optional for customers that want to administer their system themselves. It is ordered once per new installation. Maximum of 5 participants. Price does not include the costs for travel and travel time . | |
6FC8530-0TT05-0EA0 | Introduction to the MMM applications on machines and in the Cloud, troubleshooting. Incl. instruction. Precondition: Training is mandatory for each new installation of MMM. Maximum of 10 participants. Price does not include the costs for travel and travel time . | |
6FC8530-0VC00-0EA0 | A specific project is analyzed on site,checked regarding suitability for the solution SINUMERIK 840D sl HiL and the implementation overhead is estimated. The basis for this the database at the time of consulting. The service employee must be granted access to planning and configuration data. As consulting result, the customer is provided with a document that describes the supported commissioning scenarios and the associated modelling costs. Price does not include the costs for travel and travel time . |